In May 2023, a new photovoltaic system with 243 modules was commissioned at our location in Huerth. The system has a total capacity of 100 kW.
In 2024, over 55 MWh of renewable energy has already been generated. This marks a significant step towards sustainable energy and reducing our carbon footprint.